| Wertung | Thema | Autor | Zeit |
SILVER LAKE RES "SLR" produziert ca. .Thema wurde 1140 mal gelesen , umfaßt 15 Postings und wurde mit 1 Punkt bewertet |
Thread-Navigator:Neuester Beitrag Seiten: |
|
|
|
|
18.04.09 23:53
|
| Kurs:0,415 A$ Cash:13,8Mio A$ Kap:63Mio A$ -Kein Hedge -hohe Erzgehalte 10-20g\t - 1,5 Mio Oz Resourcen Produktion soll in H2 2009 auf über 50000 oz. pa. erhöht werden. Produktionkosten sollen von 680 A$ auf 570 A$ sinken. cashflow ca. 20-30Mio A$ , wenn der Goldpreis bei 1200A$ bleibt. KGV/KCV ca.2-3 |
AG-Filter: SILVER LAKE R.
Übersicht Kurse Chart News Forum Performance seit Posting Bisherige Bewertungen: 1x interessant |
|
|
|
|
18.04.09 23:58
|
|
AG-Filter: SILVER LAKE R.
Übersicht Kurse Chart News Forum Performance seit Posting |
|
|
|
|
01.05.09 18:27
|
| Perilya PEM und Sprott haben jeweils einen Anteil von ca.8% aufgebaut |
AG-Filter: SILVER LAKE R.
Übersicht Kurse Chart News Forum Performance seit Posting |
|
|
|
|
07.08.09 11:26
|
| Kurs:0,735 A$ Cash:20Mio A$ Kap:108Mio A$ -Kein Hedge -hohe Erzgehalte 10-20g\t - 1,5 Mio Oz Resourcen Produktion soll in H1 2010 auf über 110000 oz. pa. erhöht werden. |
AG-Filter: SILVER LAKE R.
Übersicht Kurse Chart News Forum Performance seit Posting |
|
|
|
|
04.09.09 19:33
|
|
AG-Filter: SILVER LAKE R.
Übersicht Kurse Chart News Forum Performance seit Posting |
|
|
|
|
09.11.09 19:08
|
| Silver Lake Resources sets sail for 100,000oz pa gold production by Proactive Investors company Perth based gold miner Silver Lake Resources (ASX: SLR) has set an ambitious target and timetable to increase gold resources at Mount Monger goldfield and Murchison projects from 1.5 million ounces to 5 million ounces within two years. This would move the company well into the mid-tier producer rang, defining sufficient resources to sustain a 100,000 oz per annum gold production. Current production is >60,000oz pa. With the company in positive cashflow in 2008, current operations throwing off $2m cash flow per month and generating a net profit of $10.7m in 2008/09, it is little wonder the sharemarket has aligned the potential with reality - driving the SLR share price up 280% from the start of 2009. Current share price is $0.95. With the plans to boost resource and production, further rises in valuation appear logical in premise. New targets within existing projects south of Kalgoorlie and an accelerated exploration program would facilitate the increase in resource managing director Les Davis said. Silver Lake plans to develop large production centres at Mount Monger and at the Murchison with multiple mines at each centre. Mount Monger Operation contains the Daisy Milano underground mine and the Christmas Flat open pit located 50 km south east of Kalgoorlie. Gold ore from Mount Monger is transported to Silver Lake’s 300,000 tpa Lakewood Gold Processing Facility located 5 km south east of Kalgoorlie and 45 km from the Daisy Milano mine. |
AG-Filter: SILVER LAKE R.
Übersicht Kurse Chart News Forum Performance seit Posting |
|
|
|
|
12.11.09 19:49
|
|
AG-Filter: SILVER LAKE R.
Übersicht Kurse Chart News Forum Performance seit Posting |
|
|
|
|
03.12.09 19:19
|
| http://stocknessmonster.com/news-item?S=SLR&E=ASX&N=472474 |
AG-Filter: SILVER LAKE R.
Übersicht Kurse Chart News Forum Performance seit Posting |
|
|
|
|
07.02.10 01:11
|
| http://stocknessmonster.com/news-item?S=SLR&E=ASX&N=477913 Highlights • Gold in ore production totalled 15,130 ounces • 600,000 tpa mill upgrade 80% complete, 50,000 tonne stockpile (6,000 ounces) ready for processing • Daisy East (discovered July 2009) producing 13 g/t Au from ore development • Gold production for 09/10 fiscal year on track for 60,000 to 70,000 ounces of gold • Significant drilling results at Mount Monger & Murchison • Silver Lake awarded 2009 Gold Miner of the Year from the Gold Mining Journal Cash and bullion on hand totalled A$28.4 million |
AG-Filter: SILVER LAKE R.
Übersicht Kurse Chart News Forum Performance seit Posting |
|
|
|
|
15.03.10 21:38
|
| WESTERN AUSTRALIAN GOLD SCENE Silver Lake opens up new gold hopes in Murchison The successful mid-tier, high-grade gold producer near Kalgoorlie, Silver Lake Resources, has found a new lead in an old mining camp in the Murchison goldfield in the mid north of Western Australia. Author: Ross Louthean Posted: Monday , 08 Mar 2010 PERTH - Silver Lake Ltd (ASX: SLR) detailed some shallow, thick and medium to high grade gold intercepts at the Genesis prospect, just 20 metres east and parallel to the Tuckabianna main zone in the north Murchison region. The drill intersections included 3 metres grading 10.2 grams/tonne, 4m @ 7.3 g/t, 6m @ 4 g/t and 2m @ 5 g/t gold. Mineralisation remains open to the north, south and at depth Silver Lake's managing director Les Davis said there was potential for further near-surface mineralisation parallel to the 13 kilometre long Tuckabianna main zone The company is getting a significant cash flow from the Mount Monger mining centre, south of Kalgoorlie. Davis said the company's accelerated exploration plan is targeting to significantly increase resources at Tuckabianna, Comet and Moyagee all in the Murchison District. He said these projects have a combined resource of 7.8 million tonnes grading 3.8 g/t gold for 1 million ounces. Genesis was a new discovery where a 21 hole shallow RC drill programme has been completed. Genesis contains multiple near surface, thick, high grade intercepts. Davis said the next phase of step-out drilling will initially target the area south of the Genesis discovery. "This exciting discovery greatly enhances our resource potential in the Murchison and confirms our belief that the region is significantly under explored. Silver Lake's Mt Monger operation, 50 km south east of Kalgoorlie contains the Daisy Milano underground mine and the Christmas Flat open pit. The company has proved up new discoveries and extensions of old prospector mines at Mt Monger. Gold ore from Mt Monger is transported to Silver Lake's 600,000 tonnes per annum Lakewood processing facility 5 km south east of Kalgoorlie. |
AG-Filter: SILVER LAKE R.
Übersicht Kurse Chart News Forum Performance seit Posting |
|
|
|
|
02.04.10 00:02
|
| Der aussichtreichte Goldproduzent in Westaustralien, vor allem wegen den High Grades. Significant Intersections at Moyagee_ March 2010 Exploration Update | Drilling Report 29-03-2010 High Grade Intersections South of Lena Deposit Highlights • Near surface, thick, high grade intercepts south of the Lena deposit: * 7.0 metres at 2.7 g/t Au from 9 metres * 3.0 metres at 8.3 g/t Au from 16 metres * 2.0 metres at 6.9 g/t Au from 41 metres * 4.0 metres at 27.8 g/t Au from 90 metres − including 1 metre at 94 g/t Au from 92 metres • Lena and Lena South mineralised strike now totals 1.6 km in length • Mineralisation remains open to the south and at depth • Potential for further high grade mineralisation along the 35 km long Lena shear zone Silver Lake Resources Ltd (“Silver Lake”) is pleased to announce an update on exploration activities at Moyagee, one of its Murchison projects. Silver Lake’s accelerated exploration plan is targeting to significantly increase resources at Tuckabianna, Comet and Moyagee located in the Murchison District of Western Australia (refer to figure 2). These projects have a combined resource of 7.8 million tonnes at 3.8 g/t Au for 1 million ounces (refer to table 2). Moyagee Project The Moyagee Project contains 35 kilometres of the highly prospective Lena Shear zone. The Lena deposit is located in this shear zone and already has a resource of 820,000 tonnes at 8.5 g/t Au for 224,200 oz over a strike length of 600 metres. Lena South A 36 hole RC programme has been completed along strike south of the Lena deposit on 100 metre centres (refer to figure 1 for location plan). The drilling intercepted near surface, thick high grade mineralisation to the south for 1 km along strike and outside of the current Lena resource within the Lena shear (refer to table 2). The mineralisation commences within 9 metres of the surface and drill hole 10MORC016 intersected significant thick high grade mineralisation at 90 metres depth (4 metres at 27.8 g/t Au including 1 metre at 94 g/t Au). The next phase of the exploration programme at Lena South will be closely spaced infill drilling between the previously drilled sections. “The Lena shear zone already hosts a large, high grade deposit at Lena. To extend the mineralised strike to 1.6 kilometres that is still open to the south and at depth is a significant outcome” said Silver Lake’s Managing Director Les Davis. “These latest results provide further mining options for assessment and enhance the near term production potential of our Murchison projects.” Mr Davis added. For further information please contact Les Davis Managing Director +61 8 6313 3800 contact@silverlakeresources.com.au About Silver Lake Resources Ltd: Silver Lake is an ASX 300 gold producing and exploration company with a resource base of 1.5 million oz in highly prospective regions including the Mount Monger goldfield and the Murchison (Tuckabianna, Comet, and Moyagee). Silver Lake’s strategy is to develop large production centres at Mount Monger and at the Murchison with multiple mines at each centre. Silver Lake’s Mount Monger Operation contains the Daisy Milano underground mine and the Christmas Flat open pit located 50 km south east of Kalgoorlie. Mount Monger has additional multi mine potential underpinned by emerging open pit production from Magic, Costello and Lorna Doone deposits. Furthermore the discoveries of Daisy East, Emma and the extension of the Rosemary lode show potential as near term production sources. Gold ore from Mount Monger is transported to Silver Lake’s 600,000 tpa Lakewood Gold Processing Facility located 5 km south east of Kalgoorlie and 45 km from the Daisy Milano mine. The Company continues to review low capital milling options for the Murchison project. Ongoing exploration will focus on extending current resources that are constrained by limited drilling particularly below 100 metres depth. Our strategy is to delineate sufficient resources to sustain a 100,000 oz per annum operation. Silver Lake’s exploration programme is targeting1 to increase its global gold resource base from 1.5 million ounces to 5 million ounces within two years. |
AG-Filter: SILVER LAKE R.
Übersicht Kurse Chart News Forum Performance seit Posting |
|
|
|
|
25.05.10 17:33
|
| Magic Intersection of 11 Metres at 59.4 g/t Au_ May 2010 Exploration Update | Drilling Report 25-05-2010 Magic Intersection of 11 metres at 59.4 g/t Au Highlights • Significant assay results from the Magic deposit: * 11 metres at 59.4 g/t Au from 251 metres • including 1.5 metres at 243 g/t Au * 10 metres at 19.1 g/t Au from 52 metres * 3 metres at 23.8 g/t Au from 44 metres * 15 metres at 4.7 g/t Au from 272 metres • All intersections outside current resource of 56,200 ounces • Mineralisation remains open to the south and at depth Silver Lake Resources Ltd (“Silver Lake”) is pleased to announce assay results from ongoing exploration at its Mount Monger Operations. Assay results (refer to table 1) have been received from a 3 hole diamond and 20 hole RC drilling programme at the Magic deposit located 3 kilometres south of the Daisy Milano mine (refer to figure 1). This drilling was designed to test the mineralisation around the planned open pit shell to the north, south and at depth. The drilling programme intersected significant mineralisation of 11 metres at 59.4 g/t Au from 251 metres and 10 metres at 19.1 g/t Au from 52 metres. The mineralisation remains open to the south and at depth. Drilling is ongoing and further results will be announced once available. Magic has a current resource of 597,600 tonnes at 2.9 g/t Au for 56,200 ounces (refer to table 2). All holes in this current programme were drilled outside the current resource. “11 metres at 59.4 g/t Au is a stand out and truly significant intersection on a regional scale” said Silver Lake’s Managing Director Les Davis. “Ongoing exploration activities continue to deliver outstanding results and support the large resource long life potential of our Mount Monger Operations” Mr Davis added. For more information about Silver Lake and its projects please visit our web site at www.silverlakeresources.com.au. For further information please contact Les Davis Managing Director +61 8 6313 3800 contact@silverlakeresources.com.au About Silver Lake Resources Ltd: Silver Lake is an ASX 300 gold producing and exploration company with a resource base of 1.5 million oz in highly prospective regions including the Mount Monger goldfield and the Murchison (Tuckabianna, Comet, and Moyagee). Silver Lake’s strategy is to develop large production centres at Mount Monger and at the Murchison with multiple mines at each centre. Silver Lake’s Mount Monger Operation contains the Daisy Milano and Daisy East underground mines located 50 km south east of Kalgoorlie. Mount Monger has additional multi mine potential underpinned by emerging open pit production from Magic, Costello and Lorna Doone deposits. Furthermore the discoveries of Emma and the extension of the Rosemary lode show potential as near term production sources. Gold ore from Mount Monger is transported to Silver Lake’s 600,000 tpa Lakewood Gold Processing Facility located 5 km south east of Kalgoorlie and 45 km from the Daisy Milano mine. The Company continues to review low capital milling options for the Murchison project. Ongoing exploration will focus on extending current resources that are constrained by limited drilling particularly below 100 metres depth. Our strategy is to delineate sufficient resources to sustain a 100,000 oz per annum operation. Silver Lake’s exploration programme is targeting 5 million oz Au in resource. |
AG-Filter: SILVER LAKE R.
Übersicht Kurse Chart News Forum Performance seit Posting |
|
|
|
|
26.05.10 21:31
|
| GRADE IS KING- deshalb lagen die Produktionkosten bei 490 AUD- im July soll ein Ressourcenupgrade kommen Ziel sind sind 300.000 Oz Gold pa. Produktion zu erreichen bis 2013/14 aktuell 100000 Oz. pa. ergibt einen cashflow von 80 Mio AUD bei 600AUD / Oz Produktionskosten und angenommenen 1400 AUD Goldpreis. MarktKAP bei 208 Mio AUD. |
AG-Filter: SILVER LAKE R.
Übersicht Kurse Chart News Forum Performance seit Posting |
|
|
|
|
01.06.10 10:51
|
| ASX ANNOUNCEMENT 1 June 2010 Drilling Confirms Costello as an Open Pit Mine Highlights • Near surface thick high grade results from the Costello deposit: �� 7 metres at 3.3 g/t Au from 7 metres �� 9 metres at 14.8 g/t Au from 13 metres �� 5 metres at 3.6 g/t Au from 16 metres �� 2 metres at 15.6 g/t Au from 22 metres �� 8 metres at 5.4 g/t Au from 30 metres �� 9 metres at 4.5 g/t Au from 37 metres �� 5 metres at 24.2 g/t Au from 44 metres • Numerous drill holes intersected mineralisation outside current resource of 11,200 ounces • Mineralisation remains open at depth and to the north and south Silver Lake Resources Ltd (“Silver Lake”) is pleased to announce assay results from ongoing exploration at its Mount Monger Operations. Silver Lake’s Mount Monger exploration strategy is aimed at identifying multiple, near term production sources for the Lakewood Gold Production Facility (“LGPF”). Assay results (refer to table 1) have been received from a 2 hole diamond and 69 hole RC drilling programme at the Costello deposit located 2 kilometres south of the Daisy Milano mine (refer to figure 1). This drilling was designed to infill and extend the mineralisation to finalise the open pit shell and mining study. Costello has a current resource of 94,000 tonnes at 3.7 g/t Au for 11,200 ounces (refer to table 2). The drilling programme intersected near surface, thick, high grade mineralisation that remains open at depth and to the north and south. Numerous drill holes intersected mineralisation outside of the current resource (refer to figures 2 and 3). A mining study is well advanced for Costello and all required regulatory documentation has been submitted to allow for timely commencement of the project. Metallurgical test work has been completed and the ore is free milling and ideally suited for processing at LGPF. “9 metres at 14.8 g/t within 13 metres from the surface is an excellent intercept to complement the advanced mining study and support a decision to mine” said Silver Lake’s Managing Director Les Davis. “These recent drilling results from Costello will add to the significant resource upgrade to be announced in July 2010” Mr Davis added. |
AG-Filter: SILVER LAKE R.
Übersicht Kurse Chart News Forum Performance seit Posting |
|
|
|
|
29.07.10 18:36
|
| Kurs +9,5%, fast ATH ,SLR&IGR sind die Top Unternehmen in Sachen Highgrade Gold 70% increase in high grade gold JORC Resource inventory to 2.5 million ounces Highlights • Mount Monger: − Total resource of 3.6 million tonnes at 9.4 g/t Au for 1.1 million ounces − 142% increase in resource at Daisy Milano to 623,700 ounces − maiden resource at Daisy East totalling 142,600 ounces at 38.7 g/t Au − 172% increase in resource at Magic to 152,800 ounces − North Monger acquisition of 80,300 ounces • Murchison: − Total resource of 13.7 million tonnes at 3.0 g/t Au for 1.3 million ounces − maiden resources at Caustons South, Genesis & Exodus totalling 121,000 ounces • Total June 2010 resource inventory: − 17.8 million tonnes at 4.4 g/t Au for 2.5 million ounces Silver Lake Resources Ltd (“Silver Lake”) is pleased to announce a June 2010 JORC Resource inventory totalling 17.8 million tonnes at 4.4 g/t Au for 2.5 million ounces (refer to table 1) an increase of 70% from the June 2009 inventory (refer to table 2). The June 2010 resource inventory is calculated after allowing for the previous year’s mining depletion of 66,700 ounces. Silver Lake’s discovery cost continues to be less than A$10 per ounce. Not all of the recent drilling success has been included in the latest inventory as drilling is ongoing. A further resource upgrade will be announced in January 2011 to include: - expanded resources at Magic and Daisy East; - maiden resources for Lena South, Leviticus and Numbers in the Murchison; and - other resources as defined by our ongoing drilling campaigns over the next six months. “To add over 1 million ounces of gold to our resource inventory during the year after mining 66,700 ounces is a significant outcome and supports our view on the underexplored, highly prospective nature of our Mount Monger Operations and Murchison projects. Further encouraging results are expected from our ongoing drilling programmes throughout the year as many of these resources are by no means closed out” said Managing Director Les Davis. “The immediate implications of the increased resource base at a sustained high grade, are to confirm a mine life at our Mt Monger Operations well beyond 5 years and to make a second production centre in the Murchison more likely than not”, Mr Davis added. The next six months surface drilling programmes at Mount Monger will mainly be targeting the thick high grade zones intersected at the Magic deposit located 3km south of Daisy which include: - 11 metres at 59.4 g/t Au from 251 metres (including 1.5 metres at 243 g/t Au); - 10 metres at 19.1 g/t Au from 52 metres; - 3 metres at 23.8 g/t Au from 44 metres; and - 15 metres at 4.7 g/t Au from 272 metres; The mineralisation at the Magic deposit remains open to the south and at depth. Underground drilling programmes over the next six months will be targeting the northern extent at Daisy East and extensions to Emma, Rosemary and Haoma. The Moyagee Project (refer to figure 3) contains 35 km of the highly prospective Lena Shear zone. The Lena deposit is located in this shear zone and already has a resource of 820,000 tonnes at 8.5 g/t Au for 224,200 oz (refer to table 1). Infill drilling will be undertaken over the next six months at Lena South, Leviticus and Numbers prospects to calculate a maiden resource for each area (refer to figure 4). For more information about Silver Lake and its projects please visit our web site at www.silverlakeresources.com.au. For further information please contact Les Davis Managing Director +61 8 6313 3800 contact@silverlakeresources.com.au About Silver Lake Resources Ltd: Silver Lake is an ASX 300 gold producing and exploration company with a resource base of 2.5 million oz in highly prospective regions including the Mount Monger goldfield and the Murchison (Tuckabianna, Comet, and Moyagee). Silver Lake’s strategy is to develop large production centres at Mount Monger and at the Murchison with multiple mines at each centre. Silver Lake’s Mount Monger Operation contains the Daisy Milano and Daisy East underground mines located 50 km south east of Kalgoorlie. Mount Monger has additional multi mine potential underpinned by emerging open pit production from Magic, Costello and Lorna Doone deposits. Furthermore the discoveries of Emma and the extension of the Rosemary lode show potential as near term production sources. Gold ore from Mount Monger is transported to Silver Lake’s 600,000 tpa Lakewood Gold Processing Facility located 5 km south east of Kalgoorlie and 45 km from the Daisy Milano mine. The Company continues to review low capital milling options for the Murchison project. Ongoing exploration will focus on extending current resources that are constrained by limited drilling particularly below 100 metres depth. Our strategy is to delineate sufficient resources to sustain a 100,000 oz per annum operation. Silver Lake’s exploration programme is targeting1 5 million oz Au in resource. |
AG-Filter: SILVER LAKE R.
Übersicht Kurse Chart News Forum Performance seit Posting |